BLNZ Kitchen 2 A complete central kitchen in Makkah

For sale & lease Makkah-code façade Within the Haram boundary Expected yield up to 10%

A central kitchen designed from the ground up for large-scale food production, with production, cold-storage and prep spaces that conventional buildings rarely offer, and a vertical workflow that keeps raw materials apart from finished product.

Façade to the approved Makkah code
Façade to the approved Makkah code
Location
Makkah · Map
Land area
600 m²
Built area
1,200 m²
Floors
3 + roof
Service lifts
2
166.8m²
Main production & cooking hall
231.09m²
Chilling, freezing & thawing
106.15m²
Three dedicated prep rooms
51.12m²
Packing & order preparation
Design

A façade to the approved Makkah architectural code

BLNZ Kitchen 2's façade follows the approved Makkah architectural code, which draws on the vocabulary, proportions and colours of traditional Makkah architecture while meeting the needs of a modern food-production building. The main façade elements and what each one does:

Rawashin, pointed arches and crenellations
Rawashin, pointed arches and crenellations
  1. 01

    Crenellated parapet (shuraf)

    They crown the parapet as on traditional Makkah and Hijazi houses, and screen the service-roof equipment from the street.

  2. 02

    Perforated rawashin screens

    Geometric screens inspired by Makkah rawashin and mashrabiya that cut the sun, keep privacy and let light and air through.

  3. 03

    Pointed arches

    They top the rawashin and glazed entrances, giving the façade its Islamic, Makkan character.

  4. 04

    Framed bay, vertical proportions

    Openings are grouped in one full-height frame, with vertical proportions that echo the rhythm of Makkah façades.

  5. 05

    Light earth-tone stone cladding

    Panels with regular horizontal joints in a light tone that reflects heat, suits Makkah's climate and blends with its surroundings.

  6. 06

    Recessed, shaded loading bay

    A service zone separate from the entrances that shades loading and keeps dispatch traffic off the main frontage.

  7. 07

    Concealed architectural lighting

    Warm concealed light lines pick out the frame and rawashin at night without glare.

Why it matters to investors and tenants

Regulatory approval

Code compliance is part of licensing and the occupancy certificate, so no façade changes are needed later.

A fitting identity

A frontage that respects Makkah's urban identity and gives the operator a fitting presence with authorities and clients.

Longer-lasting value

A building aligned with Makkah's urban-development direction holds its value and appeal over the long term.


Intro

The future of catering in Makkah

The Hajj and Umrah system is moving decisively towards regulated, licensed catering. Since the 1447 AH Hajj season, catering contracts are concluded only through the Nusuk Masar platform and with caterers licensed by the Holy Capital Municipality, and from 2026 meals became a mandatory part of Umrah packages for pilgrims from a number of countries — alongside the growth in pilgrim numbers under Vision 2030.

This shift moves demand from small, scattered kitchens to central kitchens capable of large-scale production and committed to food-safety and cold-chain standards. With demand expected to keep growing, ready facilities of this kind in Makkah — few, and hard to build — gain value.

That is what makes BLNZ Kitchen 2 a strong investment asset: a ready central kitchen on a 600 m² plot within the Haram boundary, with 1,200 m² built for production and easy access to the central area — in a market where demand is heading and the season never stops.

01

Within the Haram boundary

Located within the geographic Haram boundary of Makkah.

02

Easy access to the central area

Close to, and easy supply and distribution routes into, the central area.

Location on the map

Open in Google Maps↗

%

Expected yield up to 10%

Estimated on expected rental value, before expenses.


01

A specialised operational asset

Every floor is dedicated to a stage of production, from receiving raw materials to dispatching finished orders.

A

Designed for operations

Floors are laid out around production stages, not a conventional structural split.

B

Clearly separated flows

A vertical path from receiving to dispatch minimises overlap between stages.

C

Integrated services

HVAC, ventilation, electrical and mechanical services, plus a dedicated service roof.

Suited for
Catering companies Central kitchens Large-scale food production Restaurant chains
Production & cooking hall
Production & cooking hall

02

An integrated cold & prep chain

Separate chilling and freezing rooms, a dedicated thawing room, and a separate prep room for each type of raw material.

Cold chain

Chilling & freezing

231.09m² total
Two chiller rooms134.74 m²
Freezer room69.55 m²
Thawing room26.80 m²

Prep rooms

Dedicated prep rooms

One room per category to limit cross-contamination and keep work organised.

Poultry prep42.40 m²
Meat prep38.25 m²
Vegetable prep25.50 m²
Total prep area106.15 m²

Washing & waste

Separate areas

Changing rooms

Staff area

Dry stores

Multiple

Bakery & pastry

Separate line

HVAC

Integrated systems

Electrical & MEP

Integrated services

Cold room
Cold room
Dedicated prep room
Dedicated prep room

03

A vertical production flow

A top-down path: raw materials enter on the second floor, are prepared on the first, then cooked, packed and dispatched from the ground floor — raw and finished never meet.

R

Service roof

Services & plant
Electrical services Mechanical services Lift machinery
02

Second floor

Stage 1 – 2
Receiving & storage
Receiving Dry storage Chilled storage Thawing · 26.80 m² Bakery & pastry line
01

First floor

Stage 2
Primary prep
Poultry · 42.40 m² Meat · 38.25 m² Vegetables · 25.50 m² Chilling · 134.74 m² Freezing · 69.55 m²
G

Ground floor

Stage 3 – 4
Production & dispatch
Production & cooking · 166.8 m² Packing · 51.12 m² Washing Order dispatch prep

Two service lifts link the floors to move materials between stages.

A

Raw kept from finished

Raw materials stay upstairs; finished product leaves from the ground floor.

B

One-way flow

Materials move down stage by stage, never back.

C

Less overlap

Each stage has its own floor and space, raising efficiency and easing oversight.

1

Receiving & storage

Goods are received and sorted into dry and chilled storage.

Second floor
2

Thawing & primary prep

Controlled thawing, then each category is prepped in its own room.

Second → first floor
3

Cooking & production

Cooking lines in the main production hall.

Ground floor
4

Packing & dispatch

Orders are prepared and leave directly from the ground floor.

Ground floor

04

Virtual visit

A virtual visit inside before you come: ready to fit out and operate, with hoods and ducts installed in the production hall and finished cold and prep rooms.

Virtual visit video of BLNZ Kitchen 2.Watch on YouTube


05

The offer

Two ways in: full ownership of the asset, or a lease that lets you start operating right away.

For lease

Lease and start operating

Lease a complete central kitchen and start operating without bearing construction and structural fit-out costs, with cold, prep and production spaces designed for food operations.

Annual rent
Price on request
Readiness
Ready to lease & operate

Catering companies

A production base ready for peak seasons and large contracts.

Central kitchens

Immediate operation with a well-planned production flow.

Restaurant chains

One production hub serving every branch.

For sale

Own a ready operational asset

Own a complete central kitchen with operational specs rarely found in conventional property — for an owner-operator or an investor seeking a specialised food-sector asset.

Sale price
Price on request
Expected gross rental yield
9% – 10%
Estimated on expected rental value, before expenses

Catering companies

A permanent, high-capacity production base.

Real estate investors

A specialised asset leasable to food-sector operators.

Restaurant chains

A central kitchen serving every branch from one site.

Location

Project location

BLNZ Kitchen 2 is in Makkah, within the Haram boundary, with easy access to the central area.

21.327759, 39.775010


06

Send a request

Choose lease, purchase or invest and leave your details — the BLNZ team will contact you to arrange a visit and share the details.


07 · Contact

Book a site visit

See the project before you visit, then get in touch about sale or lease terms and to book a site visit.